Myles Standish Hall – Construction Activity – For 3/17/18 to 3/23/18

Myles Standish Hall - Construction Activity - For 3/17/18 to 3/23/18 Myles Standish Hall - Construction Activity - For 3/17/18 to 3/23/18

For 3/17/18 to 3/23/18:

Deliveries – Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.

Onsite Construction

Saturday Work – 3/17/18

  • Clean up and loadout
  • Interior taping

 Demolition/Loadout

  • Load out at Beacon Street and Bay State Road – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps

Masonry Restoration (Exterior – Bay State Road & Beacon Street)

  • Continue with masonry restoration and demolition – Bay State Road & Beacon Street
  • Restoration of façade at hoist location – Beacon Street

Roof Myles (Exterior)

  • MEP insulation

Site

  • Point Park
    • Continue drilling well points and installation of drainage