For 3/31/18 to 4/6/18:

Deliveries – Subcontractors will receive deliveries all week between 7 a.m. and 6 p.m. on both Beacon Street and Bay State Road.

Onsite Construction

Saturday Work – 3/31/18

  • Clean up and load out
  • Floor mitigation on first floor
  • Relieving angle installation at hoist location – Beacon Street

 Demolition/Loadout

  • Load out at Beacon Street and Bay State Road – Load out demolition debris from 1st floor to dumpster with ongoing daily dumpster swaps

Masonry Restoration (Exterior – Bay State Road & Beacon Street)

  • Continue with masonry restoration – Bay State Road & Beacon Street
  • Restoration of façade at hoist location – Beacon Street

Roof Myles (Exterior)

  • MEP insulation

Site

  • Point Park
    • Continue with excavation and underground
    • Set road curb
  • Charlesgate
    • Start installation of fence on Saturday, April 7, 2018 from 7am – 11am
    • Start demo of curbing and sidewalk