New Balance Field Construction Activity for the Period of April 8 – April 12

Anticipated construction activities for the week of April 8 – April 12:

**The contractor will be working on Saturday, 4/6/2013, beginning at 8:00am**

1. Site Work: Already underway and continuing for the next several weeks is site work, which includes excavators, and other earthmoving equipment. You can expected general construction noise from the equipment, and construction traffic in the form of dump trucks on the surrounding streets. Excavation and hauling of soils will continue and truck activity for the removal of the excavated soils will be coordinated and Police details will be present to help manage traffic flow.

2. Underground Site Utilities – Continuing for the next several weeks is the installation of underground utilities within the site. Underground utility construction activities will be performed concurrently with the site work, and consist of similar construction techniques such as excavators, dump trucks, etc.

3. Paving Work: Paving activity will commence during next week. Trucks will be entering and exiting the site throughout each day, and general construction noise and traffic can be expected.

View all posts