Engineering Product Innovation Center Construction Activity for the Period of April 29 – May 3
Anticipated construction activities for the week of April 29 – May 3:
1. Site Work – The contractor will be installing insulation and a vapor barrier on the floor of the 744 Comm Ave garage in preparation for pouring the new concrete slab.
2. Abatement – The contractor will continue to abate the ceiling on the first floor of 750 Comm Ave. (the old Guitar Center space).
3. Mechanical/Electrical/Plumbing – The contractor will begin to install the new plumbing in the basement of 750 Comm Ave. This plumbing work will not affect any of the existing plumbing in the building.