Goldman School of Dental Medicine – Construction Update – 05/25/18
During the week of May 28:
- Pile-drilling will continue around the perimeter of the existing GSDM building, including on the Boston Medical Center loading dock side of the building on the north, and on the west side of the building (between GSDM and the Boston Medical Center/Newton Pavilion) for the 7-story addition.
- Utility work on Albany Street will continue, from the existing GSDM building on towards 609 Albany Street.
- Investigation and rerouting of utilities around the site will continue, allowing the installation of the earth-retention system (SOE) to begin mid-week.
- Work on the new foundation system will continue along the East Newton Street side of the building in preparation for the first concrete installation in Phase 1.
- Interior demolition activities will continue in the basement and on the first floor of the School.
As a reminder to all, please be aware of all directional signage, as pedestrian travel paths may be altered at both the interior and exterior of the building. Your safety is imperative!